Task & Details:
Complex Challenge, Heavy-Lift Cargo, Site Engineering, Regulatory Compliance
A major power provider in St. Lucia faced a monumental challenge – installing a colossal 206-ton diesel engine to meet the island’s surging energy demands. They turned to NMT Projects to handle the complex hurdles of transportation, site preparation, and regulatory compliance. Through customized planning and innovative engineering, the installation was a success.
Client Background
To bolster power generation capacity and reliability, a leading St. Lucian energy company embarked on an ambitious project to install a massive 206-ton diesel engine.
The Challenge
Transporting the heavy, bulky engine through local infrastructure and varied terrain required intricate logistics planning. Stringent site engineering was needed to reinforce foundations and construct supporting infrastructure. Strict adherence to local regulations and industry standards was paramount.




Our Unstoppable Execution
NMT Projects’ unstoppable approach was three-pronged:
- Logistics Mastery: A bespoke transportation plan utilizing heavy-duty equipment and close coordination with local authorities.
- Groundbreaking Site Engineering: Cutting-edge techniques to prepare the site, including reinforced foundations and new infrastructure.
- Regulatory Adherence: Ensuring full compliance with all codes and standards through meticulous oversight.
The Results
Through relentless planning and innovative solutions, NMT Projects overcame immense logistical barriers, all while bolstering St. Lucia’s power generation capabilities.
“Our meticulous planning and execution ensured the engine was transported safely and on schedule, overcoming significant logistical barriers.” – NMT Projects