Task & Details:

Complex Challenge: Heavy-Lift, Oversized Cargo

When a major oil and gas leader needed to swiftly ship two gigantic 337-metric-ton umbilical reels, they turned to NMT Projects. Facing a narrow two-day window, we combined strategic partnerships and meticulous planning to make it happen.

Client Background

First Quantum Minerals (FQM) entrusted NMT Projects with the full logistics scope and management for their greenfield Minera Panama mine site. This meant moving all construction commodities sourced worldwide to the remote jungle location.

The Challenge

Transport two colossal umbilical reels, each weighing up to 337 metric tons, from Le-Trait, France to the port of Rotterdam. The daunting requirement? Completing the loading within an extremely tight two-day timeframe.

Our Unstoppable Execution

Time was of the essence, so NMT Projects sprung into action with a meticulously coordinated plan. We leveraged strategic partnerships with trusted ship owners to secure a specialized vessel capable of handling the reels’ immense size and weight.

Our engineering and compliance teams worked lockstep, ensuring every aspect met the highest standards. Communication across all parties – the client, vessel crew, and installation teams – was paramount to keeping operations on schedule.

The Results

Delivering a masterclass in complex logistics, NMT Projects executed a seamless, delay-free operation that achieved timely delivery within the narrow window – without any additional costs. We conquered tight deadlines through our unstoppable combination of expertise and precise oversight.


“The challenge was to find a vessel capable of shipping these large 337 metric ton reels and fulfilling the demand of a very short loading window.” – NMT Projects

Discover More

Biosecurity Conquered for Mega Crawler Crane Delivery

When Fagioli needed to import one of the world's largest crawler cranes into Australia, they turned to NMT Projects. We were energized by the challenge of ensuring the used crane met stringent biosecurity standards set by the Australian Government's Department of Agriculture, Fisheries and Forestry (DAFF) under tight deadlines.

Triumphant Installation of Colossal Diesel Engine to Boost St. Lucia’s Power

A major power provider in St. Lucia faced a monumental challenge – installing a colossal 206-ton diesel engine to meet the island's surging energy demands. They turned to NMT Projects to handle the complex hurdles of transportation, site preparation, and regulatory compliance. Through customized planning and innovative engineering, the installation was a success.

Custom Engineered Perfection for Reactor Transport

When tasked with transporting two massive reactors weighing 525 and 165 tonnes from Italy to New Orleans, NMT Projects unstoppable problem-solvers engineered a custom heavy-lift solution. Through meticulous planning and innovative design, we conquered the unique challenge posed by the 525-tonne reactor's unconventional shape.